News
- Construction Today March 2016, “In The Loop, The Conti Group is Building a Portion of a Major Fayetteville, N.C., Expressway Project,” MESH prepared the 3D data for the NCDOT Fayettville Outer Loop project
- May 2013 Forester Daily New "Painstaking, but Without the Pain of Staking - Automated grade control provides significant recovery of efficiency on landfill grading project characterized by steep slopes." MESH Built the 3D surfaces for this project.
- August 2011 Site Prep Magazine "Beginning with BIM - Maryland site development starts with 3D modeling, integrated project delivery." This story features a 9100 acre planned community uses MESH's 3D modeling.
- Nov/Dec 2010 Grading and Excavation Contractor "When Machine Controls All Work Together". JFK Airport's 13R - 31L Runway is the Project Spotlight. MESH built and managed all of the 3D Data for this project.
- July 2010 Modern Contractor Solutions "Milling in the Big Apple." This article examines the JFK Airport's 13R - 31L Bay Runway. MESH Consulting's 3D digital data was used for this project.
- February 2010 Asphalt Contractor "GPS Technology Cuts Costs, Improved Productivity on Airport Paving." This article examines Tilcon's New Jersey division using Topcon's GPS technology to pave at Teterboro Airport. MESH Consulting's Survey-Quality 3D data is used for this project.
-
July 2008 Feature Article from CE News:"Project Case Study: Smart Site Design"
A MESH value engineering project using SITEOPS is examined - a retail development in Limerick, PA. - Press Release: BLUERIDGE Analytics and MESH Consulting form Strategic Partnership (Feb 21, 2008)
-
Article from AECbytes "Building the Future" (March 31, 2008)
In this article, several MESH/SITEOPS case studies are featured.